Zum Inhalt

Simulation & Support

Task Relations

(1) Task: Documentation of a helicopter simulator

Timeframe: 03 / 2001 – 11 / 2001

Customer: Eurocopter Deutschland GmbH

Task: Complete Re-engineering of a MMI simulator and re-hosting real-time software to new platform (from SPARC to Motorola 680xx)

Sub-Tasks

  • Source Code Ananlysis
  • Compiler Switch optimisation
  • Source Code improvements (readability, maintainability)
  • Compile Warning analysis and code corrections
  • Documentation of undocumented code
  • Update make process

Tools

Tornado / VxWorks, Source Navigator, GCC, MS Office

(2) Task: Tool for displaying schematics for maintenance tasks on military equipment

Timeframe: 09 / 2000 – 01 / 2008

Customer: ESG GmbH

Task: Creation of Schematics from different inputs (TIFF, draft pictures, PDF, AutoCAD data) for conversion into vector graphics (WebCGM) and integration into an existing viewer; analysis of existing data for migration into new product

Sub-Tasks

  • Requirement Definition & Analysis
  • Schematics analysis
  • Electrical schematics optimization for imrovements in readability and information flow
  • Project Management tasks (development and engineering)

Tools

AutoCAD, ACCESS, OMNIS Studio, CGM Author (Corel), Python

(2) Task: re-hosting of air borne software for integration into flight simulator

Timeframe: 11 / 2001 – 02 / 2005

Customer: Eurocopter Deutschland GmbH

Tasks: Complete re-engineering (software & hardware) including generation of documentation according to MIL standards; project lead for sub-system implementation

Sub-Tasks

  • Requirement Analysis & Specification
  • Documentation of interfaces, source code, and design according to MIL standard
  • Project Management (development and engineering)
  • Establishing automated test environment
  • Customer and subcontractor management

Tools

LINUX, IRIX, GCC, MS Office